Facility Description: The Miling accommodation project is situated approximately 200km northeast of Perth. This CBH site consists of new prefabricated buildings similar to those at similar CBH sites. Buildings were transported from the CBH Gingin Transportable Building Storage Area.

Works Completed: HTS Constructions undertook the following works for the project:

  • Site Preparation: Preparation of existing ground with imported fill and compaction for building placement.

  • Building Installation: Setup of 12 SPQ rooms within three prefabricated four-bedroom buildings, one new prefabricated Common Room, and one prefabricated KDLU building.

  • Infrastructure: Construction of verandas, covered areas, non-slip concrete footpaths, and slabs. Installation of 1.8m high Colorbond fencing and ring lock style fences around the ATU sewer treatment system.

  • Utility Connections: Comprehensive civil, electrical, hydraulic, mechanical, and structural works associated with building installation.

  • Landscape and Access: Development of car parks, driveways, pedestrian pathways, and landscaped areas to meet DA requirements​.