McLevie Accommodation Install
The McLevie accommodation project is located relative to Dalwallinu and will expand CBH’s operating capacity with new prefabricated buildings.
Miling Accommodation Install
The Miling accommodation project is situated approximately 200km northeast of Perth, at 18201 Great Northern Highway, Miling, WA 6575.
Crushing and Screening
This facility includes a mobile crushing and screening plant designed to process waste rock from the Callie Waste Dump into usable aggregate materials for various construction activities.
Surface Electrical, Instrumentation and Communications
This package focuses on the installation of electrical systems, instrumentation, and communication networks to support the increased production capacity and operational efficiency of the expanded mining operations.
Water Treatment and Storage Facility
Supply and install the Water treatment and storage facility in the Tanami desert.
Water Treatment Facility
Design and Construction of the 2.1ML Reverse Osmosis Water Treatment Facility in Nauru to supply the island with potable water
Installation of Switchrooms
The DBS Switchrooms are an essential component of the Tanami Expansion 2 (TE2) project, located at Dead Bullock Soak (DBS) within the Newmont Tanami Operations
E&I Mill Upgrade
The Tanami Expansion 2 (TE2) project includes significant upgrades to the electrical and instrumentation (E&I) systems at the Granites Process Plant, located in the remote Tanami Desert of the Northern Territory, Australia.