McLevie Accommodation Install

The McLevie accommodation project is located relative to Dalwallinu and will expand CBH’s operating capacity with new prefabricated buildings.

McLevie Accommodation install

Location: McLevie, WA
Client: CBH
Duration: 2 Months
Type: Accommodation Install

Facility Description: The McLevie accommodation project is located relative to Dalwallinu and expands CBH’s operating capacity with new prefabricated buildings. This site houses new SPQs, a Common Room, and a KDLU unit, transported from the CBH Gingin Transportable Building Storage Area.

Works Completed: HTS Constructions undertook the following works for the project:

  • Site Preparation: Preparation of existing ground with imported fill and compaction for building placement.

  • Building Installation: Setup of 12 SPQ rooms within three prefabricated four-bedroom buildings, one new prefabricated Common Room, and one prefabricated KDLU building.

  • Infrastructure: Construction of verandas, covered areas, non-slip concrete footpaths, and slabs. Installation of 1.8m high Colorbond fencing and ring lock style fences around the ATU sewer treatment system.

  • Utility Connections: Comprehensive civil, electrical, hydraulic, mechanical, and structural works associated with building installation.

  • Landscape and Access: Development of car parks, driveways, pedestrian pathways, and landscaped areas to meet DA requirements​.

Read More
Major Kian Bullock Major Kian Bullock

Miling Accommodation Install

The Miling accommodation project is situated approximately 200km northeast of Perth, at 18201 Great Northern Highway, Miling, WA 6575.

Miling Accommodation install

Location: Miling, WA
Client: CBH
Duration: 2 Months
Type: Accommodation Install

Facility Description: The Miling accommodation project is situated approximately 200km northeast of Perth. This CBH site consists of new prefabricated buildings similar to those at similar CBH sites. Buildings were transported from the CBH Gingin Transportable Building Storage Area.

Works Completed: HTS Constructions undertook the following works for the project:

  • Site Preparation: Preparation of existing ground with imported fill and compaction for building placement.

  • Building Installation: Setup of 12 SPQ rooms within three prefabricated four-bedroom buildings, one new prefabricated Common Room, and one prefabricated KDLU building.

  • Infrastructure: Construction of verandas, covered areas, non-slip concrete footpaths, and slabs. Installation of 1.8m high Colorbond fencing and ring lock style fences around the ATU sewer treatment system.

  • Utility Connections: Comprehensive civil, electrical, hydraulic, mechanical, and structural works associated with building installation.

  • Landscape and Access: Development of car parks, driveways, pedestrian pathways, and landscaped areas to meet DA requirements​.

Read More
Major Kian Bullock Major Kian Bullock

DBS Village Expansion

Camp expansion designed to increase the accommodation capacity from 300 to 415 rooms to support the growing workforce at Newmont Tanami Operations.

DBS Village Expansion - An additional 115 rooms added to the previously installed DBS Village

Location: Tanami Desert
Client: Newmont
Duration: 4 Months
Type: Modular install
Contract: Construct and commissioning

Facility Description: The DBS Village Expansion is a significant development within the Tanami Expansion 2 (TE2) project, located at Dead Bullock Soak (DBS) in the Northern Territory of Australia. This expansion is designed to increase the accommodation capacity from 300 to 415 rooms to support the growing workforce at Newmont Tanami Operations. The facility will feature additional accommodation modules, combined laundry/locker rooms, and an extended dry mess diner module. The expansion ensures enhanced living conditions for the personnel with modern, prefabricated, modular transportable buildings, complete with all necessary amenities and services.

Works Completed: HTS Constructions carried out the following works for the DBS Village Expansion project:

  • Project Management: Implemented a comprehensive project management plan, including safety, environmental, and quality management systems.

  • Site Preparation: Coordinated with the Newmont Tanami Operations Surface Works team to prepare the site, including civil works for pad preparation and installation of buried services such as water, sewer, electrical, and communication conduits.

  • Accommodation Modules: Supplied and installed 29 accommodation modules, with 28 modules featuring 4 ensuited rooms each and 1 module featuring 3 ensuited rooms.

  • Laundry/Locker Rooms: Installed 3 combined laundry/locker room modules, ensuring they are fully operational and connected to necessary services.

  • Dry Mess Extension: Supplied, transported, and installed an extension to the existing dry mess diner, including new access walkways.

  • Structural and Finishing Works: Constructed concrete footpaths, service buggy access ways, verandahs, steps, ramps, and handrails. Installed dingo/snake guards and other necessary fittings.

  • Utility Connections: Connected existing water, wastewater, and electrical services to all new facilities, including necessary modifications and trenching.

  • Safety and Compliance: Ensured all works were carried out in compliance with Australian Standards and the National Construction Code. Installed fire hose reels, extinguishers, and signage throughout the new facilities.

  • Commissioning: Conducted comprehensive testing and commissioning of all installed systems, ensuring operational readiness and compliance with technical specifications and Australian Standards.

This expansion project demonstrates HTS Constructions' capability to deliver complex infrastructure, enhancing the living standards and operational efficiency of the Tanami mine workforce.