Design and Construction of the 2.1ML Reverse Osmosis Water Treatment Facility in Naoero (formerly Nauru) to supply the island with potable water.
Facility Description
The Naoero (formerly Nauru) Desalination Plant, designed to enhance the water supply infrastructure on the island, is set to be installed near the existing 2.1 ML/day facility. This new plant will share critical services with the existing setup, including electrical supply, generator backup, seawater intake, waste return, and permeate storage and distribution systems. The plant aims to provide a reliable source of potable water by utilising advanced reverse osmosis (RO) technology to treat seawater, ensuring consistent water quality and supply for Naoero (formerly Nauru)’s residents and industries.
Works Completed
HTS Constructions undertook a comprehensive design review and construction plan for the Naoero (formerly Nauru) Desalination Plant. The scope of work included:
- Design Review: Evaluated the existing design for gaps and proposed improvements, such as splitting the RO system into two trains for better redundancy and efficiency, and integrating anti-scaling measures.
- Site Preparation: Established new seawater intake infrastructure, including three bores and a pumphouse, to ensure a steady and reliable supply of raw seawater to the plant.
- Electrical Upgrades: Enhanced the electrical setup by confirming the capacity of the Main Switch Board (MSB) and ensuring sufficient backup power with a 500 kVA generator. This also included planning for efficient cabling routes and earthing designs.
- Construction and Installation: Mobilised materials and equipment to construct the new RO plant, including pipe supports, chemical tanks, and cartridge filters. Ensured that the plant layout was optimised to reduce unnecessary piping and improve operational efficiency.
- Safety and Compliance: Addressed safety in design issues by recommending the installation of access platforms for chemical tanks, safety showers, and bunded storage for chemicals. Ensured all work complied with relevant safety standards and procedures.
The project is geared towards significantly improving Naoero (formerly Nauru)’s water treatment capacity, ensuring the delivery of high-quality potable water to support the island's needs.
Gallery
Related projects
View all projects
Northern TerritoryCrushing and Screening
Newmont · Tanami Desert, NT
This facility includes a mobile crushing and screening plant designed to process waste rock from the Callie Waste Dump into usable aggregate materials for various construction…
- Process & Water Treatment
- Civil & Infrastructure
Northern TerritorySurface Electrical, Instrumentation and Communications
Newmont · Tanami Desert, NT
This package focuses on the installation of electrical systems, instrumentation, and communication networks to support the increased production capacity and operational efficiency…
- Electrical, Communications & Instrumentation
Northern TerritoryWater Treatment and Storage Facility
Newmont Gold · Tanami Desert, NT
Supply and install the Water treatment and storage facility in the Tanami desert.
- Process & Water Treatment
- Structural, Mechanical & Piping
- Electrical, Communications & Instrumentation
Our Capabilities
Download the HTS Capability Statement
Self-performed trades, our own plant and logistics, and a single point of accountability — the full picture of what HTS delivers across remote Australia and the Pacific, in one document.