Tailings Pipeline
The Tailings Pipeline Installation at the Granites Process Plant, part of the Tanami Expansion 2 (TE2) project, is a vital infrastructure development designed to enhance the tailings management capabilities of Newmont Tanami Operations.
Facility Description
The Tailings Pipeline Installation at the Granites Process Plant, part of the Tanami Expansion 2 (TE2) project, is a critical infrastructure development to enhance the tailings management capabilities of Newmont Tanami Operations. Located in the remote Tanami Desert of the Northern Territory, Australia, the facility aims to improve the efficiency and safety of tailings disposal, ensuring compliance with environmental standards and supporting increased production demands.
Works Completed
HTS Constructions successfully completed the following works for the Tailings Pipeline Installation:
- Project Management
- Developed and implemented a comprehensive project management plan, ensuring coordination between all phases of the project.
- Liaised with Newmont’s management team to ensure alignment with project objectives and timelines.
- Site Preparation
- Prepared the site for the installation of the tailings pipeline, including clearing, grading, and excavation as required.
- Established necessary site facilities and ensured adequate power, water, and communication services.
- Pipeline Installation
- Supplied and installed HDPE pipelines with diameters ranging from 450mm to 560mm, covering a total length of approximately 8.5 km.
- Executed precise welding and jointing of the HDPE sections, ensuring robust and leak-proof connections.
- Installed necessary supports, brackets, and fittings to ensure the stability and integrity of the pipeline.
- Conducted pressure testing and inspection of the pipeline to ensure compliance with safety and operational standards.
- Safety and Compliance
- Implemented rigorous safety protocols, including risk assessments, safety meetings, and compliance with Newmont’s safety standards.
- Ensured all work was carried out in accordance with relevant Australian Standards and environmental regulations.
- Commissioning and Testing
- Conducted comprehensive commissioning of the tailings pipeline system, including functional testing and performance verification.
- Ensured seamless integration with the existing tailings management infrastructure at the Granites Process Plant.
- Quality Assurance
- Maintained detailed documentation of all quality control measures, ensuring all works met the highest standards of quality and compliance.
- Conducted regular inspections and audits to verify the integrity and performance of the installed pipeline.
This project showcases HTS Constructions' expertise in delivering complex industrial projects, enhancing the operational efficiency and environmental compliance of Newmont Tanami Operations' tailings management system.
Gallery
Related projects
View all projects
Northern TerritoryCrushing and Screening
Newmont · Tanami Desert, NT
This facility includes a mobile crushing and screening plant designed to process waste rock from the Callie Waste Dump into usable aggregate materials for various construction…
- Process & Water Treatment
- Civil & Infrastructure
Northern TerritorySurface Electrical, Instrumentation and Communications
Newmont · Tanami Desert, NT
This package focuses on the installation of electrical systems, instrumentation, and communication networks to support the increased production capacity and operational efficiency…
- Electrical, Communications & Instrumentation
Northern TerritoryWater Treatment and Storage Facility
Newmont Gold · Tanami Desert, NT
Supply and install the Water treatment and storage facility in the Tanami desert.
- Process & Water Treatment
- Structural, Mechanical & Piping
- Electrical, Communications & Instrumentation
Our Capabilities
Download the HTS Capability Statement
Self-performed trades, our own plant and logistics, and a single point of accountability — the full picture of what HTS delivers across remote Australia and the Pacific, in one document.