Installation of Switchrooms
The DBS Switchrooms are an essential component of the Tanami Expansion 2 (TE2) project, located at Dead Bullock Soak (DBS) within the Newmont Tanami Operations.
Facility Description
The Main DBS Switchroom and 2 supporting Switchrooms are an essential component of the Tanami Expansion 2 (TE2) project, located at Dead Bullock Soak (DBS) within the Newmont Tanami Operations in the Northern Territory of Australia. This facility is designed to support the enhanced electrical infrastructure required for the expanded mining operations. The switchroom installation involves significant structural steelwork, platform construction, and modular building placement, ensuring the provision of reliable electrical distribution to the site.
Works Completed
HTS Constructions carried out the following works for the DBS Switchrooms project:
- Project Management
- Developed and implemented a comprehensive project management plan.
- Coordinated planning, scheduling, and the lift studies required for the installation.
- Steel Installation
- Erected upright steel supports and bracing before the landing of the switchroom.
- Grouted base plates after the switchroom was landed.
- Modular Switchroom Building Installation
- Offloaded and placed the 3 modular Switchrooms into its final position.
- Concrete Works
- Constructed concrete ring beams, foundations, pads for stair landings, platform columns, and gas cylinders.
- Stair, Platform, and Handrail Installation
- Assembled and installed platforms and stair modules.
- Installed handrails and grating.
- Grouted base plates and applied touch-up paint where necessary.
- Material Supply
- Supplied all fixings, sundries, and consumables as required.
- Provided all rebar and formwork needed for the project.
- Quality Assurance
- Approved Inspection Test Plans (ITPs) and Inspection and Test Records (ITRs) prior to the commencement of works.
- Used Hexagon Smart Completions for QAQC and structural certifications.
- Ensured all checklists and certifications were completed and approved before finalising the project.
This project underscores HTS Constructions' proficiency in managing and executing complex structural installations, thereby supporting the operational needs of the expanded Tanami mine.
Gallery
Related projects
View all projects
Northern TerritoryCrushing and Screening
Newmont · Tanami Desert, NT
This facility includes a mobile crushing and screening plant designed to process waste rock from the Callie Waste Dump into usable aggregate materials for various construction…
- Process & Water Treatment
- Civil & Infrastructure
Northern TerritorySurface Electrical, Instrumentation and Communications
Newmont · Tanami Desert, NT
This package focuses on the installation of electrical systems, instrumentation, and communication networks to support the increased production capacity and operational efficiency…
- Electrical, Communications & Instrumentation
Northern TerritoryWater Treatment and Storage Facility
Newmont Gold · Tanami Desert, NT
Supply and install the Water treatment and storage facility in the Tanami desert.
- Process & Water Treatment
- Structural, Mechanical & Piping
- Electrical, Communications & Instrumentation
Our Capabilities
Download the HTS Capability Statement
Self-performed trades, our own plant and logistics, and a single point of accountability — the full picture of what HTS delivers across remote Australia and the Pacific, in one document.