Bulk Material Storage Dome

Bulk material storage dome

Location: Tanami Desert
Client: Newmont
Duration: 3 Months
Type: SMP
Contract: Supply and Install

Facility Description: The Tanami Storage Dome is a critical infrastructure project located at Dead Bullock Soak (DBS) within the Newmont Tanami Operations in the Northern Territory of Australia. This facility is designed to enhance the on-site storage capacity to support the expansion of the Tanami mine. The Storage Dome includes prefabricated materials for efficient assembly to reduced on-site fabrication. The facility features a bulk earthworks pad, concrete footings and flooring, sea containers for storage, dome structural trusses, a heavy-duty wear stop fabric covering, and comprehensive electrical and water services.

Works Completed: HTS Constructions undertook the following works for the TE 2 Storage Dome project:

  • Project Management: Developed and implemented a comprehensive project management plan, ensuring coordination between engineering, procurement, and construction phases.

  • Site Preparation: Collaborated with Newmont Tanami Operations Surface Works team to construct the bulk earthworks pad, including local excavation, compaction, and foundation placement.

  • Structural Installation: Installed sea containers along two sides of the dome, structural trusses, mounting rails, and all necessary bolts and fixtures. Ensured the proper installation of heavy-duty wear stop fabric for the dome and end walls.

  • Concrete Works: Completed all concrete works, including the floor, pathways, and landings, with appropriate reinforcement and finishing.

  • Electrical and Water Services: Installed electrical systems, including power outlets, high bay lighting, and local earthing. Connected potable water services to the facility with necessary modifications and trenching.

  • Commissioning: Conducted comprehensive commissioning of all installed systems, ensuring operational readiness and compliance with technical specifications and Australian Standards.

The TE 2 Storage Dome project showcases HTS Constructions' capability to deliver complex industrial projects efficiently, supporting the expansion and operational needs of the Tanami mine.